# Plan the next sprint from your backlog

> AI sprint planning that uses your real velocity: Pia drafts the next cycle from your Linear or Jira backlog, flags what isn’t ready and waits for your OK.

For a small product team, sprint planning is often the founder on a Friday afternoon, scrolling a backlog of two hundred issues, half of them stale, trying to remember which bug three customers mentioned and how much the team really finished last time. The meeting that follows spends forty minutes on bookkeeping and ten on the decisions that matter. Then the sprint starts overcommitted, because the plan was built on hope instead of history.

Pia does the bookkeeping before anyone sits down. She reads the backlog in Linear or Jira, works out what the team has actually finished in recent cycles, carries over what is unfinished, ranks what is ready, and drafts a sprint sized to fit. She also flags what should not go in yet. AI sprint planning, done this way, does not replace your judgment about what to build. It gives you a clean draft so the planning conversation is about trade-offs, not arithmetic.

## Before the planning meeting, not during it

The job runs every Friday at 14:00 in your time zone, or Monday at 08:00 if that is when you plan. With two-week cycles it does two different jobs. In the week before a new cycle, Pia drafts the sprint. In the middle week, she posts a short check on the current cycle: what is on pace, what is at risk of not finishing, and what is blocked, so carry-over is no surprise. You can also ask Pia from the chat at any time: “Draft a sprint around the billing rewrite and see what has to give.”

## How Pia builds the draft

1. **Close out the current cycle.** She reads what is done, in progress and not started. Unfinished issues are carried over by default, with a note on any that have rolled over twice already, because those usually need splitting or dropping.
2. **Measure real velocity.** She totals the points (or issue sizes) completed in each of the last three cycles. If the team finished 31, 38 and 33 points, average velocity is about 34.
3. **Adjust for next cycle’s capacity.** Holidays, someone’s week off, a conference: each reduces capacity by that person’s share. Then she plans at about 85% of what is left, leaving room for the bugs that always arrive mid-sprint.
4. **Rank what is ready.** From the backlog she takes issues in your priority order, puts customer-reported bugs and anything with a due date near the top, and keeps dependent issues together so half a feature does not ship.
5. **Check readiness.** An issue without an estimate, without acceptance criteria, blocked by another team or larger than your size limit is flagged and left out of the committed scope, with the reason.
6. **Write the sprint goal.** One sentence that describes the outcome, such as “Customers can pay annually and get a correct invoice”, drawn from the biggest group of issues in the plan.
7. **Add a stretch list.** The next three to five ready issues, so nobody has to hunt for work if the sprint goes well.

## Linear or Jira, plus your specs

**Linear** is the backlog for many young teams: issues, cycles, estimates, priorities and labels. Pia reads all of it and, after your OK, moves the planned issues into the next cycle and sets assignees. **Atlassian** covers teams on Jira: boards, sprints and issues work the same way, and Pia can read the Confluence page behind a feature to check whether the spec is finished before it goes in. **Slack** is where the draft plan lands, in your engineering channel, so the team can react before the meeting.

Each connection uses your own account, so Pia sees only the teams and projects that account can see.

## The plan you approve

The draft arrives in Slack and in chat with Pia: the goal, velocity and capacity (“34 average, 30 available with Lee out two days, planning 29”), the committed issues in order with points and owners, the stretch list, the carry-over and what was flagged and why. “ENG-412 has no estimate. ENG-398 is 13 points, suggest splitting into the API change and the settings page. ENG-377 is blocked by the payment provider’s webhook change.” You reply with edits in plain words, “swap 377 for the export bug, drop the stretch to three”, and she redrafts.

## Nothing moves without you

Reading the backlog and drafting the plan start straight away. Moving issues into a cycle, changing assignees, creating split issues and posting in a team channel all change your workspace, so they wait for your OK. Some founders let Pia post the draft on her own once they trust it and keep only the issue moves for approval. You can also switch a chat to “Don’t ask”. Either way she stays inside your plan, your credits and your working hours.

## Your Friday afternoon, back

Preparing a sprint by hand, counting points, chasing estimates, checking specs, typically takes a founder or lead one to two and a half hours per sprint, plus a longer meeting because the prep was rushed. With Pia, prep is a fifteen-minute review and the meeting gets shorter. Over a quarter that is most of a working day back for the person who can least spare it.

## First sprint setup

1. Connect Linear or Atlassian, and Slack, with your own accounts.
2. Tell Pia your rules: cycle length, planning percentage, size limit, how customer bugs are labeled, and what counts as ready.
3. Set the schedule, for example every Friday at 14:00 in your time zone.
4. Have her draft the sprint you just planned by hand and compare. Where her draft differs, it is usually a rule you never wrote down.

## Variations for small teams

A two-person team may not need points at all; ask Pia to plan by size labels and a simple “we finish about six medium issues a week”. Teams without fixed cycles can use the same job as a weekly “what’s next” list. Pia pairs well with the rest of the team here: Sam can label support tickets that turn into bugs so they rise in the backlog, Dev can pick up a small ready issue from the stretch list, and Pia’s Friday status update closes the loop on what the sprint delivered.

---

Source: https://prosyo.com/es/ai-agents/use-cases/pia-sprint-planning/ · Prosyo